
The Ready - built Factory in Long An
The Ready - built Factory in Long An
Project details
- Area: 12,496 m2
- Legal: Land use right (SKC)
- Factory area: 7,552 m2
- Fire fighting prevent, 3-phase production power station.
- Location: Ben Luc dist, Long An

-435x290.jpg)






-330x220.jpg)











-h115.jpg)



-h115.jpg)








